A practical starting point
An OEM castor enquiry should describe the equipment, the required change and the conditions the finished assembly must meet. Begin with a listed Taishan model where possible, then identify differences in dimensions, material or control function. Feasibility, samples, tooling, quantities and delivery arrangements are confirmed against the specific project.
Separate a standard-model request from a design change
A standard-series enquiry needs a complete model code and order requirements. An OEM enquiry also needs a precise description of what must change and why. State whether the issue is mounting space, installed height, operating environment, appearance or another documented requirement. This helps the product review focus on the actual equipment interface.
Send a drawing with measurable acceptance criteria
A useful drawing identifies critical dimensions and any specified tolerances. Add loaded mass, castor layout, travel route, speed, frequency and environmental exposure. If replacing an existing wheel, include bore, hub length and axle or drive fixing. Define how the proposed sample will be checked; acceptable dimensions alone may not demonstrate the required operating behaviour.
Agree the sample and documentation requirements
Identify the measurements, material information and functional checks required before production approval. If a particular material grade, test method or report is needed, name it in the enquiry. Do not infer certification from a product category. For buyers in Europe or Russia, include the destination and documentation requirements so the commercial and technical review use the same specification.
Keep repeat orders tied to the approved reference
Use the agreed model code, drawing revision and sample reference when ordering again. Record any accepted change to materials, dimensions, colour, marking or packing. Quantity, pricing, production timing and transport arrangements belong in the quotation for that order; an earlier project is not evidence of availability or timing for a new one.
Compare the enquiry requirements
| Requirement | Information to send | Decision to confirm |
|---|---|---|
| Listed model | Complete Code Number and quantity | Confirm current specification and commercial terms |
| Modified listed model | Existing code plus marked drawing changes | Review feasibility, samples and any tooling implications |
| New requirement | Equipment drawing and functional acceptance criteria | Review the interface, duty and development scope first |
Follow the review sequence
- Send the model reference or equipment drawing with operating conditions.
- Identify required changes and critical dimensions.
- Agree the review, sample and acceptance requirements.
- Confirm the approved specification and project-specific quotation.
- Reference the approved drawing or sample on repeat orders.
Practical checks
Pro tip: Mark required changes on one controlled drawing revision. Several conflicting sketches can result in a quotation for the wrong configuration.
Pro tip: State trial quantity separately from expected recurring demand. Neither figure should be treated as an agreed MOQ until confirmed.
Compare product families, review industrial wheels or send your requirements.
