For central brake castors, start with the control layout of the complete equipment. Mark where the operator will actuate the control and which castor positions must respond. Provide a drawing showing space for the mechanism, fittings and any linkage, along with load, wheel dimensions and mounting height requirements. Check the model’s locking action and the installation and release conditions for the complete assembly. If the chassis varies across a trolley range, include each relevant drawing or interface dimension. For factory supply to an equipment manufacturer, send Taishan those requirements and quantities so the proposed central control configuration can be reviewed for each build.